Timberlands Substation

Owner:

City of Red Deer

Sector:

CANA Energy

Completion:

May 2015

Value:

$3.7 M

Architect:

Berry Architect and Associates

Delivery Type:

Construction Management

Market:

Infrastructure

Project
Details

CANA developed a substation building to house a Gas Insulated Switchgear system that provides for the grid in Red Deer. The 4,500-ft2 building was constructed to blend with the residential community that will be constructed nearby. CANA completed all of the site works, installation of an architecturally controlled fence, building construction, and electrical rough-ins, lighting, fire alarms and air handling units in the interior.

Timberlands_1.jpg

The project was completed under a design-build methodology, where CANA was responsible for the design team, sub-consultants and subcontractors for the building construction scope of work.

The building is concrete suspended slab, structural steel walls, and frame and steel stud. CANA Energy was involved with the high voltage power and transmission system installation for the project.

Timberlands_3.jpg

The building was completed and turned over in May 2015.

Share

CANA in action

We are best known for our unique and one-of-a-kind projects, but these projects are just some of many institutional, commercial, industrial, residential and infrastructure work that we complete.

View Projects